§ 18.32.043. Additional information.  


Latest version.
  • The floodplain administrator may require whatever additional information is necessary to determine whether the proposed activity meets the requirements of these regulations. Additional information may include hydraulic calculations assessing the impact on base flood elevations or velocities; level survey; or certification by a registered land surveyor, professional engineer, or licensed architect that the requirements of these regulations are satisfied.

(Ord. 403 § 1 (part), 1991)